Eindhoven Handling Cargo (EIN)

 

Airport: 
Eindhoven Airport (EIN)
Project place: 
Eindhoven
Country: 
The Netherlands
Start date: 
2005, April
Commissioning date: 
2006, January
System description: 

ULD handling and storage system

Included components: 
  • 2 Truck docks 20 ft
  • 2 Truck docks 10 ft
  • 1 Transfer vehicle 20 ft with semi-automatic controls
  • 1 Lowering workstation 20 ft NEP with split operation (2x 10 ft) facility and double weighing system
  • 3 Lowering workstations 10 ft NEP with weighing system
  • 26 Motor powered roller decks
  • 2 Stand-alone floor scales (5.5 x 5.5 m 10 ton)
  • Slave pallet system
     
  • Delivery, installation, commissioning, training
Control system: 

Overall PLC control system