Airport: 
Liège Airport (LGG)
Project place: 
Liège
Country: 
Belgium
Start date: 
2007, October
Commissioning date: 
2008, June
System description: 

ULD handling system

Included components: 
  • 20 Airside interfaces (dolly docks) with hydraulic side shift
  • 28 Workstations for building/breaking of ULD's with intergrated weighing system
  • 87 Right angle decks (RAD)
  • 2 Turntables with integrated RAD
  • 2 Hinged roller decks (bridge) with hydraulic lift
  • 4 Truck docks with pop-up ball transfer units winch
  • Castor deck area for manual ULD manoeuvring
     
  • Two-phase delivery, installation, commissioning, training
Control system: 
  • Overall PLC control system
  • Katlyn Ciele©IT system for automated control and monitoring of the handling process

Photo album

TNT Express EuroHub (LGG)