U.A.E. Armed Forces (AZI)
Airport:
Al Bateen Airbase (AZI)
Project place:
Abu Dhabi
Country:
United Arab Emirates
Start date:
2005, January
Commissioning date:
2005, July
System description:
ULD handling and storage system
Included components:
- 2 Dolly Docks 10 ft with scissor lift
- 2 Transfer vehicles 10 ft with semi-automatic controls
- 2 Lowering workstations 10 ft NEP with weighing system
- 38 Motor Powered roller decks
- 3 Truck Docks
- 2 X-ray Scanners with conveyors
- 1 Stand-alone floor scale
- Empty pallet racks
- Delivery, installation, commissioning, training
Control system:
Overall PLC control system