Project place:
Start date:
2007, March
Commissioning date:
2008, January
Reference sheet
System description
ULD handling and storage system
Included components

  • 1 ETV (3-level 10ft) with semi-automatic controls

  • 70 friction powered storage decks

  • 4 lowering workstations for 10ft ULD’s

  • 2 lowering workstations for 20ft ULD’s with split operation (2x 10ft) facility

  • 2 turntables and powered roller decks with weighing systems for connection to the ETV

  • 2 tracks of powered roller decks with airside interface

  • Civil works and flooring

  • Delivery, installation, commissioning, training

  • Operation and Maintenance Contract for 7 years

Control system
Overall PLC control system