Airports Authority of India (CCU)
CLIENT
Netaji Subhas Chandra Bose International Airport (CCU)
Airport:
Netaji Subhas Chandra Bose International Airport (CCU)
Project place:
Kolkata
Country:
India
Start date:
2007, March
Commissioning date:
2008, January
Reference sheet
System description
ULD handling and storage system
Included components
- 1 ETV (3-level 10ft) with semi-automatic controls
- 70 friction powered storage decks
- 4 lowering workstations for 10ft ULD’s
- 2 lowering workstations for 20ft ULD’s with split operation (2x 10ft) facility
- 2 turntables and powered roller decks with weighing systems for connection to the ETV
- 2 tracks of powered roller decks with airside interface
- Civil works and flooring
- Delivery, installation, commissioning, training
- Operation and Maintenance Contract for 7 years
Control system
Overall PLC control system