CLIENT
Liège Airport (LGG)
Airport:
Liège Airport (LGG)
Project place:
Liège
Country
Belgium
Start date:
2007, October
Commissioning date:
2008, June
Reference sheet
System description
ULD Handling System
Included components


  • 20 Airside interfaces (dolly docks) with hydraulic side shift

  • 28 Workstations for building/breaking of ULD’s with intergrated weighing system

  • 87 Right angle decks (RAD)

  • 2 Turntables with integrated RAD

  • 2 Hinged roller decks (bridge) with hydraulic lift

  • 4 Truck docks with pop-up ball transfer units winch

  • Castor deck area for manual ULD manoeuvring

  • Two-phase delivery, installation, commissioning, training


Control System

  • Overall PLC control system

  • Katlyn Ciele©IT system for automated control and monitoring of the handling process