TNT Express EuroHub (LGG)
CLIENT
Liège Airport (LGG)
Airport:
Liège Airport (LGG)
Project place:
Liège
Country
Belgium
Start date:
2007, October
Commissioning date:
2008, June
Reference sheet
System description
ULD Handling System
Included components
- 20 Airside interfaces (dolly docks) with hydraulic side shift
- 28 Workstations for building/breaking of ULD’s with intergrated weighing system
- 87 Right angle decks (RAD)
- 2 Turntables with integrated RAD
- 2 Hinged roller decks (bridge) with hydraulic lift
- 4 Truck docks with pop-up ball transfer units winch
- Castor deck area for manual ULD manoeuvring
- Two-phase delivery, installation, commissioning, training
Control System
- Overall PLC control system
- Katlyn Ciele©IT system for automated control and monitoring of the handling process